Reduce Peak Loads

Sites have a power import level negotiated with their distribution network operator. If the total demand on-site is greater than the agreed level the site will be charged for this breach and may run the risk of not having this power delivered.

During the normal operation of a site there may be large peaks in power demand depending on the equipment being used at the time. An E-STOR system can track the site’s energy load and discharge power to reduce the peaks.

The E-STOR control system can initiate an automatic recharge of the system when spare capacity is available and to ensure it is ready for the next load peak.